Sport Truck Homepage
Facebook Click here to find out more!

1972 Chevrolet Blazer Drilling

 
 
1972 Chevrolet Blazer Drilling
1972 Chevrolet Blazer Drilling
3. The engine was supported by a hoist, and the 4x4 engine cradle/main crossmember was removed. The new 2WD cradle was slid up to the framerails and set into position. A measurement of 20-1/4 inches from the bottom right bolt hole on the cradle to the top left rivet on the radiator support will set the wheels right in the center of the fenderwell. The holes in the cradle can be used as a template for the new mounting 1/2-inch holes that will need to be drilled. View Related Article
1972 Chevrolet Blazer Conversion 1972 Chevrolet Blazer Major Components 1972 Chevrolet Blazer Rear End 1972 Chevrolet Blazer Disassembly 1972 Chevrolet Blazer Removing Rear End 1972 Chevrolet Blazer Leaf Spring Hangers 1972 Chevrolet Blazer Transfer Case
1972 Chevrolet Blazer Crossmember 1972 Chevrolet Blazer Rear End 1972 Chevrolet Blazer Shocks 1972 Chevrolet Blazer Brackets 1972 Chevrolet Blazer Automatic Transmission 1972 Chevrolet Blazer Front Suspension 1972 Chevrolet Blazer Relocating Engine
1972 Chevrolet Blazer Fan Shrouds 1972 Chevrolet Blazer Drilling 1972 Chevrolet Blazer Motor Mount 1972 Chevrolet Blazer A Arms 1972 Chevrolet Blazer Drop Coils 1972 Chevrolet Blazer Bearings 1972 Chevrolet Blazer Power Steering Gear Box
1972 Chevrolet Blazer Finished Product
Trade In Value